Excel Knits

Home About Us Our Process The Edits Startup Support Contact Us
Premium Textile

Est. Over 3 Decades Ago

Thoughtful Manufacturing

THOUGHTFUL MANUFACTURING • BUILT TO LAST • CUSTOM UNIFORMS • HOSPITALITY APPAREL • INSTITUTIONAL WEAR • PREMIUM QUALITY • EXPERT CRAFTSMANSHIP • THOUGHTFUL MANUFACTURING • BUILT TO LAST • CUSTOM UNIFORMS • HOSPITALITY APPAREL • INSTITUTIONAL WEAR • PREMIUM QUALITY • EXPERT CRAFTSMANSHIP •

Who We Are

At Excel Knits, we sit at the crossroads of legacy and growth.

Founded over three decades ago, we have grown alongside the textile and apparel industry. We identified a consistent gap: clients didn’t just need garments; they needed guidance, customisation, and dependable execution.

Partner With Us
Craftsmanship

01. Precision in every stitch

Fabric Selection

02. Premium Fabric Sourcing

Our Philosophy

Values that drive excellence.

01

Craft Comes First

Quality in fabric, stitching, fit, and finishing is never compromised. Decades of experience have shaped our deep understanding of construction.

02

We Build, Not Just Produce

We guide clients through fabrics, styles, and construction. Mentorship-driven support for startups to avoid common manufacturing mistakes.

03

Adaptability is Strength

We evolve processes and systems as markets change. Our expertise spans both knit and woven apparel, allowing supreme flexibility.

04

People Power the Factory

Our systems support our workers, ensuring efficiency without replacing the heart and soul of traditional craftsmanship.

Product Catalogs

THE EDITS.

Basics Edit

Formals Edit

Institutional Edit

Workflow

From Concept to Dispatch.

A transparent, structured 25-55 day timeline ensuring clarity, collaboration, and unmatched consistency.

EXCEL KNITS PROCESS • MANUFACTURING •
Scroll
Down
1

Design Development

3–7 Days

Client brief + target price. Design alignment with our in-house team. Fabric suitability & initial tech inputs.

2

Fabric Selection

2–5 Days

Fabric options curated based on design & MOQ. GSM, shrinkage, color fastness checks. Trim finalisation.

3

Sampling & Dev

5–10 Days

First sample development. Fit, construction & finish testing. Costing refined based on actual consumption.

4

Approvals

2–4 Days

Sample approval, size set confirmation, final fabric & trim approvals. Production sign-off.

5

Production

10–25 Days

Fabric cutting & line planning. Stitching & assembly. In-line quality checks. Batch-wise tracking.

6

QC & Dispatch

3–5 Days

Measurement & finish checks. Defect rectification. Final packing, labeling, and dispatch coordination.

Excel Knits - Premium Footer